JSF Team Finishes F-35 Structural Testing Early, Begins Ground-Vibration Testing at Lockheed Martin
The Lockheed Martin F-35 Joint Strike Fighter team has successfully completed structural coupling testing five days ahead of schedule on the first F-35.
The testing concluded on April 2 and measured the aircraft's structural response to specific flight-control movements.
| | |
|
|