Home Archives Contact Links Gallery Reviews Shop   Radar Vector

Wednesday, September 17, 2008

Recovery progress underway for Navy P-3Cs
The U.S. Navy is making progress in the recovery of its grounded P-3C Orion aircraft. Currently, 10 of grounded aircraft have been inducted for outer wing modifications, with the first one due to be completed this fall - less than a year after grounding 39 aircraft for structural fatigue concerns.

Additionally, the Navy awarded contracts to L-3 Communications Aug. 19 and to Lockheed Martin Aug. 26 for the production of 17 outer wings assembly kits for the P-3C Orion with delivery of the first outer wings scheduled to occur in early 2010. These kits will replace the entire outer wing section, to included Zone 5, which was the area of concern in the groundings.

<< Home

External Link | | Permalink | | Digg it | Bookmark with del.icio.us