First HMX-1 MV-22 to be delivered in early 2013
The first MV-22 is on schedule to be delivered to HMX-1 in early 2013, the U.S. Navy announced.
![HMXa_1[1]](http://alert5.com/wp-content/uploads/2012/12/HMXa_11-500x333.jpg)
Aircraft 209, the fourth MV-22 to be assigned to HMX-1 awaits attachment of the tail empennage on the Bell V-22 assembly plant production floor in Amarillo, Texas, Dec. 1.
Photo courtesy of Bell-Boeing

This entry was posted
on Tuesday, December 11th, 2012 at 07:53 and is filed under Marines.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.