A $419 million THAAD production contract has been suspended as a part inside the interceptor has yet to pass qualification tests.
The delay is caused by the optical block switch which is designed to prevent accidental missile launch.
Lockheed Martin has stepped in by offering to assume additional liability if there are delays to production due to the part.