Huntington risks losing $194 million for cost overuns with USS Gerald R. Ford

Huntington Ingalls Industries Inc. (HII) stands to loss as much as $194.3 million for cost overruns building the USS Gerald R. Ford aircraft carrier.

The Navy would pick up $689.7 million of the greater than $884 million overrun while Huntington foot the rest of the bill from its construction fees of $467 million.

[thumb]http://www.bloomberg.com/news/2012-04-05/huntington-risks-losing-194-million-for-navy-carrier-s-overrun.html[/thumb]