The U.S. Air Force is preparing to start an operational utility evaluation (OUE) of the F-35A at Eglin Air Force Base on Sept. 10.
The evaluation will take approximately 65 days.
[thumb]http://www.aetc.af.mil/news/story.asp?id=123317151[/thumb]
Aviation News
The U.S. Air Force is preparing to start an operational utility evaluation (OUE) of the F-35A at Eglin Air Force Base on Sept. 10.
The evaluation will take approximately 65 days.
[thumb]http://www.aetc.af.mil/news/story.asp?id=123317151[/thumb]