Boeing and the U.S. Air Force has finished the KC-46 critical design review and is scheduled to be completed by Sept. 24.
Maj. Gen. John Thompson, the program executive officer, said the overall design maturity of the tanker is at a high level.
[thumb]http://www.af.mil/news/story.asp?id=123356510[/thumb]