China needs at least 10 months to fix the CCU of the FT-7NI; Nigeria repaired it in a week

The Nigerian Air Force says it has managed to develop an in-house fix for the Communications Control Unit (CCU) on the FT-7NI fighter trainer.

Nigerian Air Force Chengdu FT-7NI Iwelumo-2
By Kenneth Iwelumo [GFDL 1.2 or GFDL 1.2], via Wikimedia Commons


Previously, the unit – which allows both crew members to communicate – took more than 10 months to repair. Nigeria was able to fix it in a week at its air force’s Central Avionics Overhaul Calibration Centre (CAOCC).

Source